Alaköprü Dam

Dam in Anamur, Mersin Province
36°10′53.05″N 32°53′44.55″E / 36.1814028°N 32.8957083°E / 36.1814028; 32.8957083PurposeWater supply, powerStatusOperationalConstruction beganNovember 2, 2010Opening dateMarch 7, 2014Dam and spillwaysType of damEmbankment, concrete-face rock-fillImpoundsAnamur (Dragon) CreekHeight93 m (305 ft)Length385.40 m (1,264 ft)Dam volume2,008,000 m3 (2,626,365 cu yd)[1]Spillway typeControlled chute, two radial gatesSpillway capacity893.50 m3/s (31,554 cu ft/s)ReservoirTotal capacity130,500,000 m3 (105,798 acre⋅ft)Active capacity86,500,000 m3 (70,127 acre⋅ft)Inactive capacity44,000,000 m3 (35,671 acre⋅ft)Catchment area210.90 km2 (81.43 sq mi)Power StationCommission date2015 est.TypeConventionalInstalled capacity26 MWAnnual generation111.27 GWh

Alaköprü Dam (Turkish: Alaköprü Barajı) is a concrete-face rock-fill dam on the Anamur (Dragon) Creek in Anamur district of Mersin Province, southern Turkey. The development is backed by the Turkish State Hydraulic Works (DSİ). The dam was primarily built as part of the Northern Cyprus Water Supply Project, to supply water for drinking and irrigation to Northern Cyprus.[2][3][4]

Preliminary construction on the dam began on November 2, 2010 and the official groundbreaking took place on March 7, 2011. After the completion of the 560 m (1,840 ft) long diversion tunnel, construction of the dam started on August 9, 2012 with placement of the foundation.[4][5] The dam was completed on schedule, on March 7, 2014 but its reservoir did not begin to collect water until February 2015.[6][7] The dam's 26 MW hydroelectric power station is expected to be commissioned in 2015.[8]

Up to 75,000,000 m3 (61,000 acre⋅ft) water from the dam's reservoir, which makes more than half of its capacity, will be transferred to Geçitköy Dam in Northern Cyprus via an 80 km (50 mi) pipeline crossing the Mediterranean Sea under 250 m (820 ft) depth.[4][5]

Part of the populated places in the area such as the villages of Sarıağaç, Akine, Çaltıbükü and Ormancık will be submerged in the reservoir of Alaköprü Dam.

See also

  • flagTurkey portal
  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ "Alaköprü Dam and HEPP" (in Turkish). Boyut Group. Archived from the original on 15 June 2013. Retrieved 10 May 2013.
  2. ^ "Alaköprü Barajı İnşaatı" (in Turkish). Ak-Eli İnşaat. Archived from the original on 2011-03-18. Retrieved 2012-10-13.
  3. ^ "Alaköprü Barajı". Haber Anamur (in Turkish). 2012-10-12. Retrieved 2012-10-13.
  4. ^ a b c "Alaköprü Barajı Su Derivasyonu Merasimi" (PDF) (in Turkish). DSİ. Archived from the original (PDF) on 2012-10-16. Retrieved 2012-10-13.
  5. ^ a b "Alaköprü Barajı'nda Derivasyon İşlemine Başlanıyor" (in Turkish). DSİ. 2012-08-09. Retrieved 2012-11-03.
  6. ^ "TRNC Water Supply Project giant step" (in Turkish). Anadolu Ajansi. Retrieved 22 December 2014.
  7. ^ "Alakopru Dam began to fill with water". Kibris. 16 February 2015. Retrieved 25 February 2015.
  8. ^ "Alaköprü DAM and HPP". Boyut Group. Archived from the original on 22 December 2014. Retrieved 22 December 2014.
  • v
  • t
  • e
Settlements
Center city
Districts
(İlçe)
All settlements
Culture
Universities
Museums etc.
Monuments
Archaeological
wealth
others
Buildings and structures
Modern
Mosques
and
madrasas
Churches
Cemeteries
Dams
Industry and trade
Transportation
Sports venues
Geographical features
Mersin Province
  • v
  • t
  • e
Aegean
Region
Black Sea
Region
Central
Anatolia
Region
Eastern
Anatolia
Region
Marmara
Region
Mediterranean
Region
Southeastern
Anatolia
Region
  • Dams by province
  • Hydroelectric power stations
  • v
  • t
  • e
Nuclear
Renewable
energy
Geothermal
Hydroelectric
Solar
Waste
Wind
Fossil
Coal-fired
Gas-fired
Power stations projected or under construction in italics